critical_path 漏洞与 CVE 列表(4)

产品(CPE): — CVE 数: 4

critical_path 漏洞概览

critical_path 相关的公开 CVE 漏洞与安全风险信息,提供 CVSS、EPSS、公开时间与漏洞情报数据,帮助评估潜在风险与修复优先级。

漏洞分布趋势(近 24 个月)

显示 144 CVE 数
«« 第一页 « 上一页 第 1 / 1 页 下一页 »
CVE 摘要 来源 最高 CVSS EPSS % 公开时间 更新时间
CVE-2002-0787 Cross-site scripting vulnerabilities in iCon administrative web server for Critical Path inJoin Directory Server 4.0 allow remote attackers to execute script as the administrator via administrator URLs with modified (1) LOCID or (2) OC parameters. [email protected] 7.5 2.88% 2002-08-12 2026-06-16
CVE-2002-0786 iCon administrative web server for Critical Path inJoin Directory Server 4.0 allows authenticated inJoin administrators to read arbitrary files by specifying the target file in the LOG parameter. [email protected] 5.0 3.19% 2002-08-12 2026-06-16
CVE-2001-1315 Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite. [email protected] 7.5 4.34% 2001-07-16 2026-06-16
CVE-2001-1314 Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite. [email protected] 7.5 5.28% 2001-07-16 2026-06-16
«« 第一页 « 上一页 第 1 / 1 页 下一页 »
cvelogic Threat Intelligence