critical_path 漏洞與 CVE 列表(4)

產品(CPE): — CVE 數: 4

critical_path 漏洞概覽

critical_path 相關的公開 CVE 漏洞與安全風險資訊,提供 CVSS、EPSS、公開時間與漏洞情報資料,協助評估潛在風險與修補優先順序。

漏洞分布趨勢(近 24 個月)

顯示 144 CVE 數
«« 第一頁 « 上一頁 第 1 / 1 頁 下一頁 »
CVE 摘要 來源 最高 CVSS EPSS % 公開時間 更新時間
CVE-2002-0787 Cross-site scripting vulnerabilities in iCon administrative web server for Critical Path inJoin Directory Server 4.0 allow remote attackers to execute script as the administrator via administrator URLs with modified (1) LOCID or (2) OC parameters. [email protected] 7.5 16.40% 2002-08-12 2026-04-16
CVE-2002-0786 iCon administrative web server for Critical Path inJoin Directory Server 4.0 allows authenticated inJoin administrators to read arbitrary files by specifying the target file in the LOG parameter. [email protected] 5.0 11.06% 2002-08-12 2026-04-16
CVE-2001-1315 Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite. [email protected] 7.5 6.57% 2001-07-16 2026-04-16
CVE-2001-1314 Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite. [email protected] 7.5 10.12% 2001-07-16 2026-04-16
«« 第一頁 « 上一頁 第 1 / 1 頁 下一頁 »
cvelogic Threat Intelligence