critical_path injoin_directory_server の CVE(4 件)

CVE 件数: 4 CPE versions: View versions table

概要

本ページは critical_path injoin_directory_server に影響する公開済み CVE(NVD の CPE 経由で関連付け)を列挙します。各行に深刻度指標・概要・公開日が含まれます。

表示中 14 / 4 CVE 件数
«« 先頭 « 前へ 1 / 1 次へ »
CVE 概要 ソース CVSS 最大値 EPSS(%) 公開 更新
CVE-2002-0787 Cross-site scripting vulnerabilities in iCon administrative web server for Critical Path inJoin Directory Server 4.0 allow remote attackers to execute script as the administrator via administrator URLs with modified (1) LOCID or (2) OC parameters. [email protected] 7.5 16.40% 2002-08-12 2026-04-16
CVE-2002-0786 iCon administrative web server for Critical Path inJoin Directory Server 4.0 allows authenticated inJoin administrators to read arbitrary files by specifying the target file in the LOG parameter. [email protected] 5.0 11.06% 2002-08-12 2026-04-16
CVE-2001-1315 Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite. [email protected] 7.5 6.57% 2001-07-16 2026-04-16
CVE-2001-1314 Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite. [email protected] 7.5 10.12% 2001-07-16 2026-04-16
«« 先頭 « 前へ 1 / 1 次へ »
cvelogic Threat Intelligence