本页列出影响 critical_path injoin_directory_server 的已公开 CVE 漏洞(通过 NVD CPE 关联)。每行包含严重程度评分、摘要与发布日期,便于识别与分析安全问题。
| CVE | 摘要 | 来源 | 最高 CVSS | EPSS % | 公开时间 | 更新时间 |
|---|---|---|---|---|---|---|
| CVE-2002-0787 | Cross-site scripting vulnerabilities in iCon administrative web server for Critical Path inJoin Directory Server 4.0 allow remote attackers to execute script as the administrator via administrator URLs with modified (1) LOCID or (2) OC parameters. | [email protected] | 7.5 | 16.40% | 2002-08-12 | 2026-04-16 |
| CVE-2002-0786 | iCon administrative web server for Critical Path inJoin Directory Server 4.0 allows authenticated inJoin administrators to read arbitrary files by specifying the target file in the LOG parameter. | [email protected] | 5.0 | 11.06% | 2002-08-12 | 2026-04-16 |
| CVE-2001-1315 | Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite. | [email protected] | 7.5 | 6.57% | 2001-07-16 | 2026-04-16 |
| CVE-2001-1314 | Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite. | [email protected] | 7.5 | 10.12% | 2001-07-16 | 2026-04-16 |