This page lists publicly disclosed CVE vulnerabilities affecting critical_path injoin_directory_server (linked via NVD CPE). Each row includes severity scores, summaries, and publication dates to help identify and analyze security issues.
| CVE | Summary | Source | Max CVSS | EPSS % | Published | Updated |
|---|---|---|---|---|---|---|
| CVE-2002-0787 | Cross-site scripting vulnerabilities in iCon administrative web server for Critical Path inJoin Directory Server 4.0 allow remote attackers to execute script as the administrator via administrator URLs with modified (1) LOCID or (2) OC parameters. | [email protected] | 7.5 | 16.40% | 2002-08-12 | 2026-04-16 |
| CVE-2002-0786 | iCon administrative web server for Critical Path inJoin Directory Server 4.0 allows authenticated inJoin administrators to read arbitrary files by specifying the target file in the LOG parameter. | [email protected] | 5.0 | 11.06% | 2002-08-12 | 2026-04-16 |
| CVE-2001-1315 | Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite. | [email protected] | 7.5 | 6.57% | 2001-07-16 | 2026-04-16 |
| CVE-2001-1314 | Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite. | [email protected] | 7.5 | 10.12% | 2001-07-16 | 2026-04-16 |